Cabin Furniture
We have worked on a number of cabin fit outs and furniture installation. Included in the list is re-building a heads to be a second chart table, updating the heads on the same boat and installing a corian worktop on a motorboat. These tasks were all undertaken for the refit company Sam was working for at the time.
As Richardson Boat Works, he split a double berth on a Sail Training yacht to be 2 bunks, and assisted Dani (who was working for the Sail Training Charity at the time) to replace a rotten galley.

Once a heads, now a chart table

And now with trim and electronics installed

Trim work around a wet locker

Before adding trim to heads cut outs

After trim

Engine bay. Previously an empty area

Plywood template for new corian worktop install

Corian worktop installed

installing a starlink

Magnetic cover added for starlink

The galley top was rotten and delaminating

Formica removed

Plywood was subsequently removed

Template made, and a new plywood panel

New plywood and formica installed

Wooden trim added, along with the sinks

The taps were re-installed, wooden trim varnished

Raising half of a double bunk